Contract 23/2022

AC 400 V Panels for 66/20 kV Substations (Contract 23/2022)

Scope & Outcome

Design, manufacture, supply, testing, and training for alternating current (AC) 400 V switching and distribution panels serving multiple 66/20 kV substations: Al Shilfatiyah Al Qardahah, Al-Bassit, Jableh, North Tartous, Bab An-Nayrab, and Al-Maahad.

The new low-voltage boards standardize feeder protection and control across sites, improve maintainability, and provide safer isolation, clear labeling, and coordinated protection for station auxiliaries. Factory and site testing ensured conformity with specifications and integration with existing medium-voltage systems.

Project Info

Execution Date

2022

Location

Syria (multiple 66/20 kV substations)

Contractor

Rabbat Electric LLC

Client

Public Establishment for Transmission & Distribution of Electricity (PETDE)

Deliverables

  • Design & manufacturing of AC 400 V switchboards (incoming, bus-section, outgoing feeders) per project specs.
  • Factory acceptance tests (FAT): visual, dielectric, functional, and protection checks with reports.
  • Delivery & site services: supervision of placement, interconnection, and terminations.
  • Site acceptance testing (SAT): feeder functional tests, interlocks, and labeling verification.
  • Documentation: as-built single-line diagrams, wiring drawings, O&M manuals, and spare parts lists.
  • Training for operators and maintenance staff on operation, protection settings, and routine inspection.