Contract 544 – Transformer & Incomer Bays + Capacitor Bank

Design, manufacture & supply (CIF Lattakia or Tartous) · Executed by Rabbat Electric as subcontractor to UCEP

Scope & Outcome

Designing, manufacturing, supplying, transporting, insurance of complete equipment of outdoor conventional type of ten 230 kV transformer bays, ten 66 kV incomer bays & 66 kV capacitor bank bays with 66 kV capacitor banks 2x10 MVAR on the basis of (CIF) Lattakia or Tartous port, testing & submitting the necessary spare parts.

Delivered by Rabbat Electric as a subcontractor to our sister company UCEP (United Company for Electrical Projects), with full alignment on engineering standards, logistics (CIF Lattakia/Tartous), documentation, and testing.

Project Info

Awarded

2012

LC Opened

2016 (delayed due to the war in Syria)

Execution Date

2019

Completion Status

50% completed — later Caesar sanctions on Syria restricted material imports

Location

Damascus – Syria

Contractor

United Company for Electrical Projects (UCEP)

Our Role

Rabbat Electric – Subcontractor to UCEP

Shipping Terms

CIF – Lattakia or Tartous Port

Client

PETE – Public Establishment for Transmission of Electricity

Deliverables

  • Engineering design for 10 × 230 kV transformer bays and 10 × 66 kV incomer bays
  • 66 kV capacitor bank bays with 2 × 10 MVAR capacitor banks
  • Manufacturing & factory acceptance testing (FAT)
  • Transport & insurance on CIF basis to Lattakia or Tartous port
  • Site testing & submission of necessary spare parts