Contract 355/2013 – Douma Substation

Design, manufacturing, supply & erection

Scope & Outcome

Turnkey delivery of substation equipment for the Douma site (Contract 355), from engineered drawings to on‑site erection.

Project Info

Execution Date

2007–2013

Location

Douma – Syria

Contractor

Rabbat Electric LLC

Client

PETDE – Public Establishment for Transmission & Distribution of Electricity

Deliverables

  • Detailed design & drawings
  • Supply of equipment & materials
  • On-site erection & interfaces